Skip to content
  • Privacy Policy
Navigation
Search:
Facebook page opens in new windowTwitter page opens in new windowDribbble page opens in new window
Darbang Hydro
Dhaulagiri Kalika Hydropower
Darbang HydroDarbang Hydro
Sunday – Friday 10AM – 6PM
+977 14436819, 4442730info@darbanghydro.com
  • Home
  • Mission & Vision
  • Our Team
  • Project Features
  • Documents
  • Photo Gallery
  • Project Updates
  • Home
  • Mission & Vision
  • Our Team
  • Project Features
  • Documents
  • Photo Gallery
  • Project Updates

Darbang Hydro

Project Salient Features
You are here:
  1. Home
  2. Project Salient Features

PROJECT AREA

The project is located in Malika Rural Municipality of Myagdi District (Gandaki Province). All Project components lie in the vicinity of Darbang Bazzar.

The headwork is located about 3km upstream from Darbang Bazaar and stretches along the left bank of Myagdi Khola. The Power House is located 2.5km downstream from Darbang Bazaar and lies on the right bank of Myagdi Khola.

ACCESSIBILITY

From Kathmandu to Pokhara – one can either take 30 minutes flight or a 5-hour drive along Prithivi Highway.

From Pokhara to Project Location is approximately a 3.5-hour drive

THE MAIN PROJECT COMPONENTS

DAM:
37m long concrete gravity weir, 2 Under Sluices (3m width) with Hydraulic gates

INTAKES:

4 side intakes (3.8m width)

SETTLING BASIN:

2 double chambered 115m long

HEADRACE TUNNEL:

3030m (Ø4.6m, inverted D shaped)

SURGE SHAFT:

38m HIGH (Ø10m) vertical Surge Shaft

DROP SHAFT:

55m (Ø4.6m) Vertical Drop Shaft

PENSTOCK PIPE:

1250m long (Ø 4.0m) Penstock Pipe

POWERHOUSE:
30m x 50m Power House to house all equipment.

TRANSMISSION LINE:

Power generated from this project is to be evacuated to National Grid at 132/33KV Nepal Electricity Authority Dandakhet Substation via 132KV transmission line. Dandakhet Substation is approximately 7.5 km upstream from the powerhouse.

Recent news
  • Agreement Between Sanima Hydro and Dhaulagiri Kalika Hydro Ltd
    December 2, 2019
  • Construction of the Darbang-Myagdikhola Hydropower Begins
    December 2, 2019
  • The construction of the Darbang-Myagdikhola Hydropower Begins
    November 27, 2019
Contact info
  • Address:
    Head Office:
    Gyanewshwor-30, Kathmandu,
    Bagmati Province, Nepal

    Site Office:
    Dukhu, Malika Rural Municipality-6, Myagdi,
    Gandaki Province, Nepal
  • Phone numbers:
    +977 14436819, 4442730
  • E-mail:
    info@darbanghydro.com

Find us on:

Mail page opens in new windowWebsite page opens in new window
Contact us

Submit

Copyright©2022, Darbang Hydro.